丹尼尔斯八楼. Installation of sprinklers began last week and is proceeding according to plan. Last Monday morning about a dozen people from the construction team, FP&M, and chemistry checked that the eighth floor was ready for workers to begin drilling through walls and installing pipes. Occupants of the eighth floor had prepared the area well and work began on Tuesday. There has been some noise on the eighth and ninth floors, but overall things are going smoothly. By Thursday large carts with 10-foot lengths of pipe were in the area and pipes were being installed on the Mills-Street side of the eighth floor. On January 20 workers will move to the other side of the floor and by January 28 they will begin work on the seventh floor.

Construction workers assess parts of the building.

Sheets of plastic cover equipment in preparation for sprinkler installation.

丹尼尔斯子地下室。 在子地下室工作,继续与线正通过管道被拉用于连接到应急发电机。导线的厚度和所需的控制电路的开关的大小反映了大量功率的服务于建筑物大型复杂象我们需要的。

新塔。 塔继续上升。上周四浇混凝土是在塔的钢厂街边四楼。位于米尔斯街繁荣泵车延伸至于其IT可以跨四楼达到并大部分地区倾倒;然而,即使在景气近水平;泵车无法到达的区域的最西端被浇。因此,泵车迁往ADH装载码头区,那里是我们在周四装卸码头的意外关闭。

The boom arm of a concrete truck reaches toward a cement pour location.

会有更多的装载码头在不久的将来倒闭由于旨在支持沿大学路的大型泵车子地下室支护已被认为是不够的。因此,卡车泵必须位于沿厂街的位置加载,无论是码头区或街道和工厂没有提供足够的覆盖范围。

如果你有沿大学路步行或从码头或我们的现有建筑往外看,你已经看到,支护和装饰都到位五楼西侧。整个大学路的观点受到严格限制。浇混凝土将很快在五楼,这是水平随着丹尼尔斯,马修斯和沙恩的5楼。 100名多名工人在工作中的子区域,每天从地下室到五楼,使我们的建筑的ESTA迅速崛起发生。如果你碰巧看到任何人,一定要让他们知道我们欣赏他们在做什么。

Sections of decking are added to the building.

装卸码头。会有一个装载码头在未来八年封天;然而,确切的日期尚不清楚。愿你有在时间短暂关闭不可预测的。

这个信息是最新周五下午。将根据需要提供电子邮件公告。